Hagane Systems PT1.01 Panel Tie is Design Engineered
to be Safer, Quicker & Easier to Install.
the problem
developers
Developers are always searching for new, innovative solutions that can help them save time & money on every project, and they rely on their engineering resources to present them with these solutions.
engineers
Engineers have an obligation to their clients to implement solutions that are cost, time & structurally effective, yet sometimes there are limitations on what can be performed by contractors.
panel contractors
Contractors are always battling with competitors to win work, and developers usually opt for whoever can do the job faster and cheaper. Unfortunately, faster and cheaper can sometimes mean sacrificing quality or compliance.
“Hagane Systems was designed to benefit everyone involved in the process of concrete panel connection, saving TIME, MONEY & RESOURCES for everyone.”
the solution
Our series of panel connectors & panel ties are delivering an industry-leading level of efficiency on site, allowing contractors to complete work 3X faster & Safer than ever before.
PC1.01
PC3.02
pc2.01
PC4.01
pc3.01
PT1.01
** Stacked/Multi-Level variations of all Panel Connectors & Panel Ties are also available. **
the process
step 1
Fill tubes with anywhere from 0.54L - 4.32L of non-shrink grout.
step 2
Align pins with grout tubes and drop connector into place.
step 3
Allow non-shrink grout to set and complete panel connection.
** Hagane applicators have been installing between 75-100 connectors per day in comparison to 25 traditional stitch plates **
PC3.02 - Panel Connector Installation
PT1.01 - Panel TIE Installation
THE BENEFITS
engineers
Offer a solution to clients that:
Saves Time
Saves Money
Increases Strength
Reduces Steel Costs
panel contractors
Stand out from your competitors by:
Installing 3X Faster
Reducing Labour
Reducing Risk
Eliminating Welding & Patching
“The efficiency of Hagane Systems had such an impact on reducing various costs, including labour, plant & equipment hire. But with the PT1.01 replacing conventional wall ties, we saved over $90,000 in steel costs.”
reviews
Watching the slow process of connecting concrete panels the traditional way, MBD believed there had to be a better solution.
The efficiency of Hagane Systems had such an impact on reducing various costs, including labour, plant & equipment hire. But with the PT1.01 replacing conventional wall ties, we saved over $90,000 in steel costs.
Needless to say, Hagane Systems is, and will be our solution for all precast panel projects moving forward
Richard Prosenik
Director at MBD
As a construction firm focused heavily on panel related projects, we look for any cost and efficiency advantage possible so long as it doesn’t affect the safety of our staff and quality of our finished product.
Hagane Systems has allowed us to save money on plant and labour with our installers connecting panels in minutes, while eliminating welding and patching. And now our finished panels look cleaner than ever before
Sebastian Canzoneri
Director at C3
The conventional panel tie and cast-in plates has long been the standard components holding panel together in typical warehouse design. The Hagane System of connectors represents an innovative solution to an antiquated method of connecting concrete panels.
As with all new products introduced to the market, once the engineering concepts are understood, it’s not difficult to provide our clients with an alternative to the conventional system being Hagane.
Danny Borzillo
Director at Intrax
OUR Projects
10 Graystone Crt
epping
Warehouse Development
C3 Construction Group
Panel Contractor - Lift Precast
53 ravenhall way
Ravenhall
Warehouse Development
Owner/Builder
Panel Contractor - Premium Precast
36 Hood St
Airport West
Factory Development
Vita Building Group
Panel Contractor - Premium Precast
60 Malvern St
Bayswater
Warehouse & Office Development
C3 Construction Group
Panel Contractor - Lift Precast
6 Richards CRt
Keilor Park
Warehouse Development
Momentum Building & Development
Panel Contractor - FCD
52 Bakers RD
Coburg
Business Park
Momentum Building & Development
Panel Contractor - CPS
3 Dyson crt
breakwater
Warehouse Development
C3 Construction Group
Panel Contractor - Lift Precast
100 Cooper St
Epping
Northern Honda Warehouse & Showroom
CMW Design & Construct
Panel Contractor - Enterprise Precast
our PARTNERS
PIONEERING concrete panel connectionS
With the complete system cutting time, money and resources, we are setting a new standard for Strength, Speed, Savings & Safety in the panel industry with a solution where Everyone Wins.
Get in touch.
Hagane Systems is already being used nationally and delivering industry leading results. To learn more, see our case studies, or review our pricing, leave your details and we will be in touch.